The Michigan Engineer News Center

MEZ Mentorship

A professor embraces a contributing family member at the opening ceremony of the Adam Friedman Marine Hydrodynamics Laboratory.

The newly renovated and renamed Aaron Friedman Marine Hydrodynamics Lab opened its doors to the public on Central Campus in Ann Arbor, MI. The MHL is the only existing facility belonging to the College of Engineering that is still on Central. Built in 1904, the much needed renovations cost 2.2 million dollars. New construction consisted of a new entrance way, spacious new staff offices, a student computer lab and a hallway display of historical artifacts. Seen here is Julie Young, Director, Marine Hydrodynamics Laboratory, with a member of the Friedman Family. Photo by Robert Coelius/ Michigan Engineering, Communications and Marketing